MB7-639 MB7-639 MB7-639 www.it-pruefungen.de
Prüfungsnummer: MB7-639
Prüfungsname:NAV 5.0 Manufacturing
Version: demo
1. A client uses multiple locations for manufacturing. Which of the
following fields should be used to show that all locations use raw materials
from a single location?
A.Use Forecast on Locations
B.Components at Location
C.Transfer from Code
D.Preset Output Quantity
Answer:B
MB7-639 MB7-639 MB7-639 www.it-pruefungen.de
2.What is the Matrix per Version window used for?
A.To compare the original BOM against the current version
B.To compare single level BOMs against multilevel BOMs
C.To compare all existing versions of a production BOM
D.To compare the current version of a production BOM against the last
version
Answer:C
MB7-639 MB7-639 MB7-639 www.it-pruefungen.de
3.Which of the following are true statements about the use of phantom
BOMs? Choose the 3 that apply.
A.Phantom BOMs allow the MTO process to account for components
without creating Item Cards or a production order for the subassembly.
B.A phantom BOM represents a group of items that put together during
production.
C.The time required for assembling a phantom BOM is zero or is in the
master item’s routing.
D.A Phantom BOM is used for quality control only.
Answer:A B C