MB7-639 MB7-639

MB7-639 MB7-639 MB7-639 www.it-pruefungen.de

Prüfungsnummer: MB7-639

Prüfungsname:NAV 5.0 Manufacturing

Version: demo

1. A client uses multiple locations for manufacturing. Which of the

following fields should be used to show that all locations use raw materials

from a single location?

A.Use Forecast on Locations

B.Components at Location

C.Transfer from Code

D.Preset Output Quantity

Answer:B

MB7-639 MB7-639 MB7-639 www.it-pruefungen.de

2.What is the Matrix per Version window used for?

A.To compare the original BOM against the current version

B.To compare single level BOMs against multilevel BOMs

C.To compare all existing versions of a production BOM

D.To compare the current version of a production BOM against the last

version

Answer:C

MB7-639 MB7-639 MB7-639 www.it-pruefungen.de

3.Which of the following are true statements about the use of phantom

BOMs? Choose the 3 that apply.

A.Phantom BOMs allow the MTO process to account for components

without creating Item Cards or a production order for the subassembly.

B.A phantom BOM represents a group of items that put together during

production.

C.The time required for assembling a phantom BOM is zero or is in the

master item’s routing.

D.A Phantom BOM is used for quality control only.

Answer:A B C

MB7-639 MB7-639 MB7-639 www.it-pruefungen.de

Hinterlasse eine Antwort